Bridge Replacement US 285 and US 24 in July 2021

Local area road closures, accidents, cautions, traffic hazards, school closures, received from various sources including phone and email reports from contributors.
Post Reply
User avatar
ParkBull
Site Admin
Posts: 781
Joined: Sun Dec 24, 2017 10:33 pm

Bridge Replacement US 285 and US 24 in July 2021

Post by ParkBull » Fri Jun 25, 2021 9:50 am

PARK COUNTY — The Colorado Department of Transportation will begin bridge replacement operations July 6 on US 285 over South Fork of South Platte. The project, located in Park County, has multiple locations, US 285 at MP 172.2 to 173.5, CO 9 at MP 63, and US 24 at MP 47.5. Zak Dirt Inc. has been selected as the contractor for this project. Work is expected to be completed in the fall, weather permitting.

Work will require a three month full closure on US 285 with an offsite detour utilizing CO 9 and US 24. Work will include rebuilding the approaches to the bridge and replacing the guardrail. Work will also include wetland mitigation and a stream diversion utilized to complete the bridge work. The project will consist of one bridge replacement, bridge rail and guardrail replacement and roadway reconstruction for the bridge approach. This project will benefit motorists by making the bridge safer and improving the driving experience.

Travel Impacts

Travelers will encounter night work operations Monday through Friday, from 6 p.m. to 6 a.m. from July 6 until July 17. Single lane closures and shoulder closures will be in effect. Starting in August, the full detour will be in place through October. Motorists are urged to use caution and watch for heavy equipment. At times, through lanes and turn lanes may be temporarily closed to traffic causing brief travel delays. Any temporary closures are to ensure the safety of the workers and the traveling public. Motorists should slow down, drive with caution and give themselves extra travel time.

Stay Informed

For additional information about this project, contact the project team.

Project hotline: (719) 249-4995

Project email: us285bridgereplacement@gmail.com

Project web page: https://www.codot.gov/projects/us285-s- ... eplacement

Post Reply